Start with the layout
Keeping the bath, basin and toilet in broadly the same positions can simplify the work. Moving them may create a better room, but drainage, water supplies and access need to be checked before the plan is agreed.
Bathroom Fitters Dumfries
A new layout, a better shower, a complete change of feel. Bring the whole room together with bathroom fitting planned around your home.

A good bathroom installation starts with what needs to work better. Tell us about the room you have, how you use it and the changes that matter most.
Keeping the bath, basin and toilet in broadly the same positions can simplify the work. Moving them may create a better room, but drainage, water supplies and access need to be checked before the plan is agreed.
Ask for the quotation to set out removal, preparation, plumbing, wall and floor finishes, sanitaryware and final making good. Confirm who is supplying each item and how unexpected issues behind the old surfaces will be handled.
Think beyond the sample colour. Tile size, grout joints, shower-wall panels and floor texture all affect how the room looks and how you look after it. Bring a few reference pictures to help explain the finish you want.
If this is your only bathroom, discuss access to facilities during the installation. Clear the route into the room and agree protection, waste removal, delivery space and a realistic programme before work starts.



Ask for a clear scope, product specification and any allowances. Compare what is included, as well as the final price. Plan your bathroom budget.
You do not need a finished design to get in touch. Start with your room and the changes you want to make.
Tell us your postcode, what you would like to change and any ideas you have.
Discuss the layout, finish choices and what needs checking in your home.
Confirm the scope, written quotation and installation arrangements before work begins.
Yes, a retained layout is a useful starting point. The condition and suitability of existing plumbing and surfaces still need checking.
The programme depends on the scope, room condition, product availability and whether services are moving. Ask for a planned start date and sequence after the room has been assessed.
Tell us which products you already have or want to buy. Compatibility, dimensions, delivery dates and who is responsible for each item should be agreed before installation.
Tell us what is not working in your current room and what you would like instead. We’ll discuss your plans and the next step.
07700 175069If we miss your call, leave your details using the form so we can get back to you. No need to have every detail decided.